Line high speed Madrid - Valladolid

Load testing for bridges in the new Spanish north and northeast railways access

Area Infraestructures
Field Inspections and loading tests
Location Valladolid
Client Administración de Infraestructuras Ferroviarias (ADIF)
Contract amount 1.042.000 €
Contract period 2007 a 2008
UTE OFITECO 25% - TIFSA 40% - ICC 35%
Downloadable files: