Line 2 in the Malaga underground. Section: "Héroes de Sostoa - Martin Carpena"

Field Measurement for the infraestructure and urbanization of the line 2 in the Málaga unrerground. Section: "Heróes de Sostoa - Martín Carpena"

Area Instrumentation and system
Field Structural health monitoring
Location Málaga
Client Administración de Infraestructuras Ferroviarias (ADIF)
Contract amount 1.241.586,21 €
Contract period 2009 a 2010
UTE OFITECO 70% - AMBERG 30%
Downloadable files: